How Long Did You Wait?

Home / Sewage spills

Sewage spills

How often Yorkshire Water's storm overflows spilled into rivers, drains and the sea in Hull and the East Riding in 2025.

Official Environment Agency figures, 2025

Hull and the East Riding

4,240
spills counted
from 142 of 167 monitored overflows
29,351
hours of spilling in total
About 1,223 days, added up across every overflow
41
overflows spilled 40 times or more
The government's target for 2050 is an average of no more than 10 a year

No spills1 to 9 spills10 to 3940 or more

Tap an overflow for its name, where it spills to, and its count for 2025. Bigger circles spilled for longer. Map © OpenStreetMap contributors.

Official Environment Agency figures, 2025

The 15 overflows that spilled longest

OverflowSpills intoSpillsTime spilling
Hull sewage worksRiver Humber11665 days
Atwick No.2 sewage worksTributary of Stream Dyke8763 days
Hollym sewage worksTributary of Winestead Drain10152 days
Melton sewage worksRiver Humber24551 days
Stamford Bridge North pumping stationRiver Derwent6246 days
Skeffling sewage worksTributary of Skeffling Clough Drain4938 days
Bishop Wilton sewage worksBishop Wilton Beck6533 days
Ellerker sewage worksCrabley Creek7633 days
Barmby Moor pumping station overflowUnnamed Tributary of Black Dike9433 days
Kilham sewage worksLowthorpe Beck4331 days
New Ellerby pumping stationA Tributary of Kelwell Drain5826 days
Howden sewage worksRiver Ouse (tidal)7425 days
Goole Carr Lane pumping stationRiver Ouse7725 days
North Ferriby sewage worksRiver Humber10824 days
Lelley sewage worksTributary of Northfield Drain3923 days

Names are the Environment Agency's own for each permitted outlet. Some sites have more than one outlet, each counted separately.

Near bathing beaches

  • 84 spills from Flamborough sewage works (Danes Dyke, Flamborough; Flamborough South Landing)
  • 81 spills from Bridlington sewage works (Bridlington South Beach)
  • 63 spills from Hornsea pumping station (Hornsea)
  • 41 spills from Sands Lane pumping station (Bridlington North Beach)
  • 39 spills from Springfield Avenue 2 overflow (Bridlington South Beach)
  • 37 spills from Belgrave Road Bridge overflow (Bridlington South Beach)
  • 35 spills from Bempton pumping station (Danes Dyke, Flamborough)
  • 30 spills from Flamborough pumping station (Flamborough South Landing)
  • 27 spills from Bridlington sewage works (Bridlington South Beach; Wilsthorpe)
  • 13 spills from Bessingby Road overflow (Bridlington South Beach)
  • 12 spills from Carnaby (village) pumping station (Wilsthorpe)
  • 12 spills from Hilderthorpe Road overflow (Bridlington South Beach)
  • 9 spills from Scarborough Road Brid 2 overflow (Bridlington South Beach)
  • 8 spills from Memorial Gardens pumping station (Withernsea)
  • 4 spills from St Annes Road overflow (Bridlington North Beach)
  • 2 spills from Carnaby pumping station (Wilsthorpe)
  • 2 spills from Water Lane Flamborough overflow (Flamborough South Landing)
  • 2 spills from Limekiln Lane overflow (Bridlington North Beach)
Official Environment Agency figures, 2025

Yorkshire Water beside the other water companies

23.6
spills per overflow, on average
Average of England's water companies: 20.5▼ Worse than the average
41%
of its overflows spilled 10 times or fewer
Average: 49%▼ Worse than the average
51,431
spills across Yorkshire
285,931 hours, from 2,176 overflows

Yorkshire Water had the third highest number of spills per overflow of the 10 water and sewerage companies.

Reading these figures fairly

  • Storm overflows are legal in heavy rain. They stop sewers backing up into homes and streets. The concern is overflows that spill often, or when it has not rained much.
  • What spills is mostly rainwater mixed with sewage, and at sewage works it has usually been screened or settled first. It is not the same as raw sewage, but it is not clean either.
  • A wet year means more spills. Counts go up and down with the weather, so one year alone does not show whether things are improving.
  • How spills are counted. Any spilling within a 12-hour block counts as one spill, and each further 24 hours counts as another.
  • Monitors are not always working. An overflow whose monitor was off for part of the year may have spilled more than is shown.
  • The area is drawn by hand along the edge of Hull and the East Riding, so an overflow right on the boundary could be in or out by mistake.